AS-9102 First Article Inspection Report (FAIR)

Purpose: An AS-9102 first article inspection form is used to provide a consistent format for reporting first article information to aerospace customers. It verifies that the given part, or parts, meet all required customer drawing specifications.

The AS-9102 first article inspection activities shall include:

  1. Review of part drawings and specifications for key characteristics.
  2. Dimensional inspection utilizing Apple Rubber Products Quality Laboratory.
  3. Review of dimensional inspection results.
  4. Confirm each key characteristic has inspection results.
  5. Verify that inspection results were obtained using NIST traceable measuring device.
  6. Review of nonconformance information, if applicable.

Option 1 — Sampling:

Option 2 — Sampling:

Below is a link to a sample First Article Inspection Report depicting option 1:

AS 9102 First Article Form

Featured Article

Video: 5 Things You Need to Know to Avoid Automated Assembly Issues

Video: 5 Things You Need to Know to Avoid Automated Assembly Issues

Recognizing seal feedability problems during the production process often occurs too late for a simple solution. That’s why we created a video that outlines exactly what you need to be on the lookout for.

Questions?

*Please use our quick form for all Sample Request, Request for Quote or Engineering Requests.